
24
TECHNICAL DATA
Gas connection Rp ½ (½" BSP female)
Pressure test point Front left hotplate injector
Gas rate adjustment None
Aeration adjustment None
Electrical connection 4mm
2
twin and earth
230/240V a.c. 50Hz.
13A fuse.
INSTALLATION INSTRUCTIONS
G20 at 20mbar
G30 at 28-30mbar
G31 at 37mbar
Burner
HEAT INPUT INJECTOR HEAT INPUT INJECTOR
HOTPLATE
Front Left and Rear Right
3.0 kW 1163.0 kW (220g/h) 86
HOTPLATE
Front Right and Rear Left
2.0 kW 103 2.0 kW (145g/h) 70
GRILL 2.2 / 2.4 kW
MAIN OVEN1.8 / 2.0 kW
TOP OVE
N1.7 / 1.9 kW
Komentáře k této Příručce